paint spraying equipment
пульверизатор для краски
P
packaging
padlock
paging system
paint coat, paint layer
paint drying oven
paint shop
paint store
painting
pallet store
palletting installation
parallel connection
parameter , caracteristic value
parapet
partial discharge system
partial failure
partial protection
partial room protection
partial surveillance
partial surveillance X
partition of complex separation
partition wall
passage for cables
passive infrared detector
path of fire spread
pendulum dtector
penetration
penetration of fire
penetration X
performance check
perimeter infrared barrier
periphal surveillance
permanent availible to intervence
permanent magnet
permanently manned
permanently monitored connection
permission to smoke
person identification system
personal injury
personal liability insurance
personal protection
personal protection system
personel protective equipment
personel X X
photgraphic room surveillance
photoconductive cell
photoelectric cell
phototransistor
physical explosion
physical state
picture of risk
pier pillar
pile hight
pillar hydrant
pillar hydrant key
pilot piping
pipe connection
pipe cross section area
pipe dead end system
pipe diameter
pipe grid system
pipe loop system
pipe network
pipe pier
pipe supports
pipe suspension
pipework above ground
pistol type branch
place of fire origin
plan of action
planning
planning documentation
planning of a project
plant fire squad
plaster
plaster threat
plaster threat holder
plaster, rough cast
plumbing device
plywood
point detector
point type detector
poisoning
police guard
porch, balcony, prvious construction
porosity
porosity , permeability
portable extinguishing apparatus
portable fire extinguisher
portable gas detector
portable ladder
portable pump
porters lodge
possibility for escape
post
post , stanchion
post, stand, upright
potassium
potential danger
potentiometer
powder capacity
powder equipment
powder monitor
powder nozzle
power
power consumption
power drain
power failure
power supply
power unit
pre - warning
pre - warning time
pre-action system
pre-determinded attendance
preathing apparatus, positive pressure
precast steel reinforced components
precaste concrete
precaution
prefabricated concrete
prefabricated concrete part
prefabricated item , finished part
prefabrication
preferential premium rate
prelimary clarification
premium discount
premium rate
premium supplement surcharge
presenting a fire hazard
presenting of a fire hazard
pressur gauge
pressure drop
pressure gange
pressure hight , geodedic
pressure hight , manometric
pressure increase
pressure limit valve
pressure loss
pressure measurement , reading
pressure reducing valve
pressure relief opening
pressure resistance
pressure rise
pressure switch
pressure tank
pressure tank explosion
pressure- vacuum gauge
pressurized gas
pressurized gas tank
pressurized watertank
prestressed concrete
prevention
prevention X
preventive
preventive fire protection measures
primary control unit
primary damage
primary line
primary source
primer
priming time
principal rafter
principal truss or beam
private fire brigade (industrial fire brigade)
private power generator
probability
probabillity of occurence
process / developement / order of events
process fault
process hasard
production / business requirement
productivity curve
products of combustion
professional fire brigade
prohibition sign
projection
propagate, spread
property protection
property value, material asset
proprty damage
protect
protected area
protection against gas
protective clothing
protein foam compound
provision of extinguisher
proximity danger
public fire brigade
pulse generator
pumice concrete
pump
pump capacity
pump casing
pump crew
pump impeller
pump operator
pump pressure pipe
pump primer
pump suction pipe
pump suction socket
pump system
puplic fire alarm
purification plant
purification, clearing
purified product
purlin , joist
push booton alarm
push button
putty , cement
pyrolysis
pyrophoric
pyrophoric material
pyrophoric material X
phpMyVisites | Open source web analytics